Neutralisation Pit Discharge line replacement project

CLIENT: SHELL - GTL
Date of award : 3rd Jan 2023
Completion : 25th Dec 2023

Overview

The project entails the replacement of the Neutralisation Pit Discharge Line under P-810239, utilizing dual laminate piping and fittings to enhance the system's durability, chemical resistance, and overall performance. This includes the design, supply, fabrication, installation, and commissioning of dual laminate materials, ensuring the discharge line is equipped to handle corrosive and challenging environments. The scope prioritizes precision in execution, adherence to quality standards, and minimal disruption to plant operations. The upgraded system will ensure long-term reliability, reduced maintenance requirements, and compliance with operational and environmental safety standards

Scope of Project

• Pre-qualification of plastic welders & laminators.

• Pre-fabrication of dual laminate spools. GRVE-UPVC & GRVE-ECTFE

• Hydro-testing for the fabricated spools.

• Spark test for the fabricated spools.

• Installation of the fabricated dual laminate spools.

• Commissioning.