Spent Caustic Winterisation Project (Supply, Fabrication & Installation of GRVE-UPVC Lined Spools)

CLIENT: SHELL GTL
Date of award : 5th August 2019
Completion : 30th July 2020

Overview

The Spent Caustic Winterisation Project involved the supply, fabrication, and installation of GRVE (Glass Reinforced Vinyl Ester) spools lined with UPVC to enhance the system’s performance and durability under winter operating conditions. The project aimed to provide a corrosion-resistant and reliable solution for handling spent caustic, ensuring seamless operations in challenging environments. The scope included precise fabrication, quality-controlled material supply, and meticulous installation to meet stringent industrial standards. Successfully completed, the project has delivered a robust system that ensures long-term operational efficiency, minimal maintenance, and enhanced safety for the facility.

Scope of Project

• Stress analysis

• 1000hrs material qualification test

• Supply of Dual laminate piping and fittings (GRVE-UPVC • Pre-fabrication of the dual laminate material

• Hydro-testing

• Installation of the pre-fabricated spools

• Commissioning