The SHELL GTL Project involves the full replacement of the desalination water unit's GRV (Glass Reinforced Vinyl Ester) piping system. This project is essential for ensuring the reliable and efficient transport of desalinated water within the facility, crucial for the plant’s operations. The new GRV piping system is selected for its superior corrosion resistance and mechanical strength, providing an enhanced solution that promises greater durability and reduced maintenance needs. This upgrade is a strategic move to optimize water management and maintain the high operational standards required in the energy production processes at the SHELL GTL facility.
• Supply of new GRV piping and fittings.
• Dismantling of all old GRP piping.
• Installation of new GRV piping and fittings.
• Hydrotesting.
• Commissioning and handover.
Spent Caustic Winterisation Project (Supply, Fabrication & Installation of GRVE-UPVC Lined Spools)
Manufacturing, Supply, Fabrication, Installation & Commissioning of GRE Fire Water Piping System for QAFCO-3 Plant
P-810239 Neutralisation Pit Discharge Line Replacement Project